Initial Commissioning; Switching On The Tumble Dryer - Miele PDR 914 HP Operating And Installation Instructions

Commercial heat-pump dryers
Hide thumbs Also See for PDR 914 HP:
Table of Contents

Advertisement

Initial commissioning

16
 Risk of injury or damage to property due to improper installa-
tion.
Incorrect installation of the tumble dryer can lead to personal injury
or damage to property.
Before commissioning the tumble dryer for the first time, make sure
it has been installed correctly.
Connect the tumble dryer correctly.
Please follow the instructions in "Installation".
 Damage caused to tumble dryers with heat pumps by switching
the machine on too soon after commissioning.
Commissioning the machine too quickly can damage the heat
pump inside the tumble dryer.
After installing the tumble dryer, wait for at least one hour before
starting a drying programme.
Complete the initial commissioning process. During the initial com-
missioning process, you will need to define the settings for daily use
of the tumble dryer. Some settings can only be modified during the
initial commissioning process. After that, they can only be changed
by the Miele Customer Service Department.
These settings are also described under "Supervisor level".

Switching on the tumble dryer

Press the  button.
The welcome screen will light up.
Setting the display language
You will be asked to select the display language. You can change the
language at any time (see "Language" under "Supervisor level").
Language
english
deutsch
(CA)
english
english
(AU)
(GB)
Swipe left or right across the display with your finger until the lan-
guage you want appears.
Briefly touch the required language with your finger.
The selected language will be highlighted in orange and the display
will change to the next setting.
español
français
(F)
OK

Advertisement

Table of Contents
loading

This manual is also suitable for:

Pdr 918 hpPdr 922 hp52914009eu52922023eu

Table of Contents