Pentair 80E User Manual page 25

End entry membrane housings for reverse osmosis
Table of Contents

Advertisement

HEAD – DIS-ASSEMBLING & ASSEMBLING
STEP 3 INSTALL SEALING PLATE
1. With its larger diameter facing the bearing plate, press the sealing plate onto the machined
end of the feed/concentrate port.
2. Rotate sealing plate until the two center holes are aligned.
STEP 4 INSTALL PERMEATE PORT
1. From sealing plate side, insert threaded end of permeate port through bearing/sealing plate
combination. Press firmly until permeate port bottoms on sealing plate.
2. Install snap ring into groove on outer end of permeate port using snap ring pliers.
Permeate Port being inserted
NOTE
Head assembling of the 80E30 is now complete.
Page 25 of 38

Advertisement

Table of Contents
loading

Table of Contents