80E45/ 60 & 80E100/ 120 - Pentair 80E User Manual

End entry membrane housings for reverse osmosis
Table of Contents

Advertisement

HEAD DIS-ASSEMBLING & ASSEMBLING – 80E45/60 & 80E100/120
NOTE
Read all guidelines in this section before attempting to rebuild the head.
Head rebuilding should be performed in a clean work area. Dust or dirt on O-rings or other parts can
scratch inner surfaces and cause subsequent leakage.
Replace any components not in "as-new" condition. Re-using corroded or damaged components can
result in explosive head failure.
WARNING
DO NOT SERVICE ANY COMPONENT UNTIL YOU VERIFY THAT PRESSURE IS FULLY
RELIEVED FROM THE VESSEL.
REPLACE ANY COMPONENTS NOT IN "AS-NEW" CONDITION. REUSING CORRODED OR
DAMAGED COMPONENTS CAN RESULT IN CATASTROPHIC FAILURE.
SNAP RINGS MUST BE FULLY SEATED AT BOTTOM OF GROOVES PROVIDED.
INCORRECT ASSEMBLY CAN RESULT IN CATASTROPHIC RELEASE OF PORT.
Page 20 of 38

Advertisement

Table of Contents
loading

Table of Contents