3.3 Cable Routing
Proper cable routing can avoid water dripping to cable glands and make the
sealing of the cable glands well. Please follow the requirements to lay cables
for the inverter.
1. Keep 10-20 cm length of straight cables from the edge of cable glands.
2. Anchor or support the straight cables to strain relief.
3. Must be routed to create a "hump" to prevent flowing water on the cable gland.
>0°
<10
cm
>10
cm
<0°
>10
cm
<0°
Figure 3-11: Cable routing
27
Installation