Lincoln Electric LN-25 PRO DUAL POWER Service Manual page 15

Hide thumbs Also See for LN-25 PRO DUAL POWER:
Table of Contents

Advertisement

A-7
POWER SOURCE TO LN™-25 PRO
CABLE CONNECTION DIAGRAMS
ACROSS THE ARC SET-UPS
CC Power Sources with Output Terminals Always
Hot (See Figure A.5)
CC Power Source
Ranger 250, 250 LPG
Ranger 305G, 305D
Commander 300
Vantage 300, 400, 500
Air Vantage 500
Ranger 10,000
Ranger 3 Phase
Sae 400 with CV Adapter
Engine Driver welder with
Wire Feed Module
If the power source has a Remote/Local switch, place
the switch in the Local position.
Place the CV/CC switch in the feeder in the "CC" posi-
tion.
CV
Power Sources with Stud Connectors and
Remote/Local Switch (See Figure A.6)
CV-655
DC-400
DC-600
DC-655
V450-Pro
Place the power source Remote/Local switch in the
Local position.
Place CV/CC switch in the feeder in the "CV" position.
INSTALLATION
FIGURE A.5
Electrode
Work
See Magnum Literature
FIGURE A.6
Electrode
Work
See magnum Literature
LN-25™ PRO DUAL POWER
LN-25™ PRO
DUAL POWER
Work clip
K#
K2614-1, -3
LN-25™ PRO Dual Power
KP1695-XX
KP1696-XX
KP1697-XX
K1803-1
LN-25™ PRO
DUAL POWER
Work clip
K#
K2614-1, -3
LN-25™ PRO Dual Power
KP1695-XX
KP1696-XX
KP1697-XX
K1803-1
A-7
Description
Drive Roll Kit
Welding Gun
CC power Source
Welding Cables
Description
Drive Roll Kit
Welding Gun
CV power Source
Welding Cables

Advertisement

Table of Contents
loading

Table of Contents