Verification Testing
Verifying the
Interconnect
Cabling
Power and
Ground Wiring
Plant Battery "A"
Step 1
3-6
!
!
!
!
!
Open Protective Guards
16
15
14
DC -48V
DC -48V
RTN
Frame
Ground
Points
(requires
10-32 x 1/4"
To
screws)
Figure 3–5. Power and Ground Wiring
13
12
11
10
8
9
7
Plant
Circuit
Battery A
Breaker
Barrier Strip
1000-A2-GN20-00
6
5
4
3
2
1
DC -48V
DC -48V
RTN
0069
Plant
Battery B
Barrier Strip
To
Plant Battery "B"
September 2002