Product Documentation Online; Package Checklist; Installation Requirements - Paradyne 7123 Installation Instructions Manual

Zhone 7123 dsu-csu combo: installation instruction
Hide thumbs Also See for 7123:
Table of Contents

Advertisement

Product Documentation Online

Complete documentation for this product is available at www.paradyne.com.
Select Library
Select the following document:
7123-A2-GB20
7123 SNMP DSU/CSU User's Guide
To order a paper copy of a Paradyne document:
T
Within the U.S.A., call 1-800-PARADYNE (1-800-727-2396)
T
Outside the U.S.A., call 1-727-530-8623

Package Checklist

Verify that your package contains the following:
7123 SNMP DSU/CSU
Power cord with a wall-mount 120 VAC power transformer
Self-mounting tie wrap for power cord strain relief
RJ48C modular cable for U.S. network access
Be sure to register your warranty at www.paradyne.com/warranty.

Installation Requirements

Make sure you have:
A dedicated, grounded power outlet that is protected by a circuit breaker within
6 feet of the 7123 DSU/CSU
A clean, well-lit, and ventilated site that is free from environmental extremes
One-to-two feet of clearance for cable connections
A physical connection to the T1 network
An asynchronous terminal or PC (personal computer)
If desired, an operable Ethernet LAN (Local Area Network) connection for access
by an NMS (Network Management System)
Configuration information for the DSU/CSU being installed or replaced
Appropriate cables:
— Ethernet cable
— Data port cable
— COM port-to-terminal or COM port-to-PC cable
Technical Manuals
T1/E1 Digital Access Devices.
2

Advertisement

Table of Contents
loading

Table of Contents