Fig. 5.5.15 Fixing the fan to the floor, wall
or ceiling
Fig. 5.5.17 Mounting using special acces-
sories – adaptors
AIR DUCT CONNECTION
The following devices can be connected to pull the air directly from the ventilated room or from the air duct system.
CHIMNEY INSTALLATION
• The chimney has to be mounted on the roof above the prepared chamber which cannot be greater than its own internal chamber.
• The chimney has to be firmly attached to the roof so that the later mounted fan will be in a horizontal position.
• The chimney must be covered with a heat-deterrent substance. Choose the isolating material with the most thermal resistance.
• Cover the roof coating.
• The chimney must be firmly attached to the roof.
• The space between the chimney and roof coating has to be sealed with waterproof material.
FANS v2024.1
Fig. 5.5.16 Fan connection to the air duct system using accessories. If using flexible connec-
tions, the fan must be additionally fixed to the floor, wall or ceiling by using an additional air duct
Fig. 5.5.18 Enough space must be retained for opening and cleaning the impeller
Fig. 5.5.19 Air duct connection
Fig. 5.5.20 Chimney installation