Mounting in steel stud frame
Prevista Dry washbasin element 820 – 980 mm
▶
Position the element on the floor rail.
▶
If necessary, adjust the foot depth from 50 mm (pre-mounted) to 75
mm.
▶
Pull the foot out and turn by 90°.
▶
Fix the feet.
▶
Adjust the construction height of the element in accordance with the
on-site marking of the upper edge of the finished floor.
X with construction height 820: 800 mm
n
X with construction height 980: 960 mm
n
▶
Attach the element to the stud frame using the screws supplied.
Handling
15