Commissioning - Leuze electronic DB 112 B Original Operating Instructions

Double sheet monitoring
Hide thumbs Also See for DB 112 B:
Table of Contents

Advertisement

7

Commissioning

Note!
If the indicators flash during the initial commissioning, a calibration must first be performed
on a single sheet.
First apply operating voltage. An alignment mode is available for commissioning. This can
be used to check the alignment of the transmitter and receiver.
Alignment mode
Actuate the TEACH-IN button for > 5 s and The
Note!
After exiting alignment mode,
Leuze electronic
Green
LED:
Yellow
LED:
Red
LED:
it is absolutely necessary to perform a calibration.
DB 112 B
and
LEDs flash simultaneously at
Alignment
Exiting:
ok
Actuate the TEACH-IN button < 5 s
Align transmitter and receiver until
LED lights up green.
Alignment
Can only then be exited!
critical
Exceptional exiting only possible by
means of Power OFF!
Align transmitter and receiver until
LED
Alignment bad
Can only then be exited!
Exceptional exiting only possible by
means of Power OFF!
Commissioning
lights up green.
9

Advertisement

Table of Contents
loading

Table of Contents