C O N F I G U R E F T TA O T D R ( C o n t i n u e d )
Configure Setup > Analysis (Figure 9 above) settings as follows:
5.
►
Set BBU Jumper to Yes if there is a BBU Jumper Cable between the Launch Cable (such as a
ground based OVP between the BBU and the tower) and Trunk Cable;
Set BBU Jumper to No if the Launch Cable is directly connected to the Trunk Cable.
►
Set RRU Jumper to Yes if there is a Junction Box/OVP/Squid at the top of the tower between
the Trunk Cable and RRU;
Set RRU Jumper to No if there is no Junction Box or no RRU Jumper.
►
Set Mode to Construction if there will be a loopback cable and/or receive cable employed.
►
Set Loopback Cable to Yes if there is a Loopback planned to test up and back down the tower;
Set Loopback Cable to No if there will not be a loopback employed.
►
Set Launch Cable End to Event 1 (always employ a launch cable: 20m recommended)
►
Set Receive Cable Start to Event 1 if a receive cable will be employed
Configure Link Description (Figure 10 below) settings as follows:
6.
►
Set Base Station ID to the Test Location or BBU Identifier.
►
Set RRU ID to the RRU Identifier or the Cable Identifier or sector (e.g. Alpha, Beta, Gamma).
►
Set Fiber Code to the fiber number and polarity using the up and down arrows.
►
Set Change Fiber Nbr to Increment.
►
Set Distance Unit to feet or meters as desired.
►
Enter the Technician ID and Job ID as needed, or they could come from Job Manager.
OneAdvisor-800 Portable Network Tester
Figure 10: Setup example - Link Description
VIAVI//Public