3.3 Packaging and delivery inspection

1. Check the delivery against the packing list, consignment note or other delivery documentation and
check that everything is included and nothing is damaged.
2.
Contact Munters immediately if delivery is not complete in order to avoid installation delays. Any
visible damage must be reported in writing to Munters within five days and prior to unit installation.
3.
If the unit is to be put into storage prior to installation, see section 3.5, Storing the equipment .
NOTE!
If the installation is not to be carried out immediately after the arrival of the equipment it is advisable
to leave the packaging material in place on the dehumidifier, or to re-use the packaging material to provide
temperature protection for the unit during later transport to installation site and during installation.

3.4 Transport

Use the handle when lifting the dehumidifier. If possible, use a pallet loader to move the dehumidifier. It is
recommended to use the original packaging when shipping the dehumidifier.

3.5 Storing the equipment

The following is important if the dehumidifier is to be stored prior to installation:
Place the dehumidifier on a horizontal surface.
Protect the dehumidifier from physical damage
Store the dehumidifier under cover and protect it from dust, frost, rain and aggressive contaminants

3.6 Site requirements

The dehumidifier is only intended for indoor installation. The unit should be placed in an upright position
on a level floor, or platform. Avoid installing the dehumidifier where there is a risk of water entering the unit,
or in a very dusty environment. Refer to Munters for advice if in doubt.
For unit and service dimensions, see section 9, Technical specification.
NOTE!
It is important that the intended installation site meets the requirements in order to achieve the best
possible performance and trouble-free operation.