3.3 Inspection of delivery

1. Inspect the delivery and compare with the delivery note, order confirmation or other delivery
documentation. Make sure that everything is included and nothing is damaged.
2. Contact Munters immediately if the delivery is not complete in order to avoid installation delays.
3. If the unit is to be put into storage prior to installation, see section Storing the equipment.
4. Remove all packaging material from the unit, and make sure that no damage has occurred during
transportation.
5. Any visible damage must be reported in writing to Munters within 5 days and prior to installation of
the unit.
6. Dispose of the packaging material according to local regulations.
NOTE!
If the dehumidifier is delivered as a split unit, especially check that the seals on the rotor box are not
damaged.
Figure 3.1 Rotor box seals
NOTE!
After delivery inspection, the consignment note should be signed to confirm approval of delivery.
3.4 Moving the dehumidifier
The dehumidifier must be handled with care. All panel doors must be closed during transportation. Use
a fork lift or pallet loader to move the dehumidifier. The forklift/pallet loader must be equipped with
extended forks to ensure even weight distribution. See section 8.4, Technical data for weight data.
WARNING!
Move the dehumidifier carefully as there is a risk of the dehumidifier tipping over.
Figure 3.2 Correct length on forklift arms
20
Installation
190TEN–1081–J1408

Advertisement

Table of Contents
loading

This manual is also suitable for:

Mcd120gMcd140gMcd155g