XEROX DOCUPRINT 96/4635/180 IPS GUIDE TO CONFIGURING AND MANAGING THE SYSTEM
Figure 4-48. Output DFA Profile window
You may make changes to the following fields:
•
Time Between Sheets (ms) (p1) — Specifies the time
required by the third party finishing device from the top of
the sheet to the bottom of the sheet. The printer inserts
skips to enforce this timing. You can specify from 0 to 32767
milliseconds.
•
Time Between Sets (ms) (p3 or p3a) — Specifies the time
required by the third party finishing device from the top of
the last sheet in a set to the bottom of the first sheet in the
next set. The printer inserts skips to enforce this timing. You
can specify from 0 to 32767 milliseconds.
•
Minimum Set Time (ms) (p3b) — (Available on some
systems) Specifies the minimum time required by the third
party finishing device to process a set.
•
Time to Cycle Up (ms) (p5) — Specifies the amount of
time required by the third party finishing device to obtain
SETTING THE SYSTEM CONFIGURATION
4-59