LG LGE ESS Home 6 Installation Manual page 54

Energy storage system
Table of Contents

Advertisement

54
Installation
Connect to +/- of the PV1 and PV2 terminals.
Assemble the supplied cable glands to the right side of the PV power wire.
2
PV
Rotate the cable gland to tighten the gland hole.
CAUTION
y Make sure the cables are not moving after tightening the cable gland. Otherwise, the IP56 grade
cannot be maintained.
PV
PV
PV
PV
1+
1-
2+
2-

Advertisement

Table of Contents
loading

Table of Contents