LG LGE ESS Home 6 Installation Manual page 42

Energy storage system
Table of Contents

Advertisement

42
Installation
Insert the AC (Grid) cable through the upper cable gland to the right side of the unit.
Pass the AC cable through the cable gland, rubber seal and housing as shown in the figure.
2
Strip off the 3-conductor power wires from at the AC (Grid) as shown in the figure.
2
2
Power wires with a cross-sectional area 4 mm
- 6 mm
Not using the PE equipotential point at the AC output port: two-core (L and N).
Using the PE equipotential point at the AC output port: three-core (L, N, and PE) outdoor copper
cable.
L (Brown)
N (Blue)
PE (Green)
15 mm
115 mm

Advertisement

Table of Contents
loading

Table of Contents