Download Print this page

Altronix TROVE T2SSK1Q Installation Manual page 4

Advertisement

T2SSK2(D)Q: Access Controller Position Chart for the S2-INST Installation Kit:
1. Align S2-INST mounting holes with pems on TSS2 (Fig. 3, pg. 4).
2. Attach S2-INST to backplane with lock nuts (provided) (Fig. 3a, pg. 4).
3. Mount backplane to enclosure with hardware.
4. Fasten TSS2 backplane to Trove2 enclosure utilizing hardware (provided).
Fig. 3
L
G
RSB2
L
G
BAT
NC
C
NO
NO
C
NC COM
NO
Altronix
NETWAY5B
is mounted to
the side wall
of enclosure
BAT
NC
C
NO
utilizing BR1
mounting plate
NO
C
NC COM
NO
- 4 -
Altronix
eFlow104NB
N
Altronix
eFlow102NB
AC1
AC DC
1 min enable
N
NC
C
NO NC
C
NO
TRIGGER EOL
NO GND
2 hr
disable
+ AUX -
SUPERVISED
AC FAIL
BAT FAIL
RESET
+PWR2
+PWR1
+ INP1 -
+ INP2 -
+ INP3 -
+ INP4 -
Tamper
+ INP5 -
+ INP6 -
+ INP7 -
+ INP8 -
AC
NC
C
NO
Altronix LINQ8ACM(CB)
C
NC COM
NO
C
NC COM NO
C
NC COM
NO
C
NC COM
NO
C
NC COM
NO
C
NC COM NO
C
NC COM
+PWR2
+PWR1
+ INP1 -
+ INP2 -
+ INP3 -
+ INP4 -
Tamper
+ INP5 -
+ INP6 -
+ INP7 -
+ INP8 -
AC
NC
C
NO
Altronix LINQ8ACM(CB)
C
NC COM
NO
C
NC COM NO
C
NC COM
NO
C
NC COM
NO
C
NC COM
NO
C
NC COM NO
C
NC COM
S2-INST
Installation
Kit for
S2 Network
Node
Altronix
Altronix
LINQ8PD(CB)
LINQ8PD(CB)
Fig. 3a
Pem
Lock nut
Backplane
S2-INST Bracket
Trove2 S2 Q Kits Installation Guide

Advertisement

loading
Need help?

Need help?

Do you have a question about the TROVE T2SSK1Q and is the answer not in the manual?

This manual is also suitable for:

Trove t2ssk1dqTrove t2ssk2qTrove t2ssk2dq