Maintenance; Periodically Checks; Cleaning And Decommissioning - WAGNER GM5000 Operating Manual

3-in-1 electrostatic, aircoat & airless system
Table of Contents

Advertisement

EDITION 03/2012
OPERATING MANUAL
6

MAINTENANCE

➞ Observe safety instructions in chapter 2.
6.1

PERIODICALLY CHECKS

For the safe operation of electrostatic manual coating systems for fl ammable liquid
spraying materials are intervals for periodically inspections defi ned as follows:
Inspection point
Gun cleaning, fl ushing
Earthing measures
Inspection for damage
Locking of the technical ventilation
with the electrostatic manual
coating system
The above recommended intervals are maximum values and may be modifi ed from
operator depending on the local and operational conditions and contamination.
Damaged devices must be taken out of service immediately and repaired.
6.2

CLEANING AND DECOMMISSIONING

The spray gun and the unit must be cleaned every day. Only use the cleaning solvent
recommended by the paint manufacturer.
Cleaning agent in the air duct!
Functional faults caused by swollen seals
Never immerse the spray gun in cleaning agent.
SIHI_0066_GB
Incorrect maintenance/repair!
Risk of injury and damage to the equipment
SIHI_0141_GB
PART NUMBER DOC 2319150
Inspection interval Remarks
daily
weekly
weekly
yearly
CAUTION
Repairs and part replacement may only be carried out by
specially trained staff or a WAGNER service center.
Before all work on the unit and in the event of work interruptions:
- Switch off the energy/compressed air supply.
- Relieve the pressure from the spray gun and unit.
- Secure the spray gun against actuation.
Observe the operating instructions when carrying out all work.
Chapter 2.2.4; chapter 6.1
Chapter 2.2.2; chapter 5.1.5
Chapter 6.2; 6.3; 6.4 and 6.5
Chapter 5.1.2
WARNING
GM
5000EAC.
36

Advertisement

Table of Contents
loading

This manual is also suitable for:

Vm500F230

Table of Contents