Cap-Blade Unit: Ink Tube Arrangement; Logic Board: Cable Wiring; Carriage Unit: Ffc Arrangement - Canon MG2100 Series Simplified Service Manual

Hide thumbs Also See for MG2100 Series:
Table of Contents

Advertisement

(3) Cap-blade unit: ink tube arrangement

(4) Logic board: cable wiring

Pass the cables through the carriage motor core
so that they can loop around the core twice.
Logic Board

(5) Carriage unit: FFC arrangement

Position the FFC with the
print side facing up when
installed in the printer.
Bend and pass the FFC
through the slot.
(19/34)
Pass around the hook once.
Fit in the hooks.
Fit to the rib.
Through the slot to
the other side.
Fit the cable edge in the ribs.
easyfixs.blogspot.com
Turn it over.

Advertisement

Table of Contents
loading

Table of Contents