KNX communications (RDG2..KN)

4.12.6 Example of heating and cooling demand zones

Explanation relating to
the illustration
Notes

4.12.7 Send heartbeat and receive timeout

126 | 186
The building is equipped with Synco controls on the generation side and
RDF../RDU../RDG.. room thermostats on the room side.
In the case of a typical application, the individual RDF../RDG.. room thermostats
send their heat demand to the primary controller (in the above example to the
RMH760).
(1) and (2) designate the numbers of the distribution zone.
This type of application can also be applied to refrigeration distribution zones.
If no 2-pipe fan coil unit is used, heat and refrigeration demand signals are sent
simultaneously to the primary plant.
In a KNX network, S-Mode and LTE-Mode communication objects can be
exchanged between individual devices. The "Receive timeout "defines the period of
time within which all the communication objects requested from a device is
received at least once. If a communication object is not received within this period,
a predefined value is used.
Similarly, the "Send heartbeat" defines the period of time within which all the
communication objects requested must be transmitted at least once.