Before Installation; Choosing An Installation Site; Indoor Unit Installation - EAS Electric GAMA CST4C Instruction Manual

Vrv systems 2nd generation indoor units
Table of Contents

Advertisement

Available languages

Available languages

1. Before Installation

1. Determine the route to move the unit to the installation site.
2. First unseal and unpack the unit. Then, hold the seats of the
hanger (4 pcs) to move the unit. Refrain from exerting force on
other parts of the unit, especially the refrigerant piping, water
discharge piping, and the plastic parts.

2. Choosing an Installation Site

1. Choose a site that fully complies with the following conditions and
user requirements to install the air conditioning unit.
 Well ventilated.
 Unobstructed airflow.
 Strong enough to bear the weight of the indoor unit.
 Ceiling has no obvious slant.
 There is sufficient space for repair and maintenance work to be
carried out.
 No leakage of flammable gas.
 The length of the piping between the indoor and outdoor units is
within the permitted range (refer to the manual on installation of
the outdoor unit).
2. Mounting height
 The mounting height is 2.5~3.5 metres (2.5~4 metres for model 140).
3. Mount using the mounting screws.
4. Space required for installation (unit (mm)):
>1000
Figure 2.1
Connect to water
piping outlet
Ceiling
Air outlet
Air inlet
910 mm (ceiling hole position)
Floor
Figure 2.2
Table 2.1
Model
≤8.0kW
≥9.0kW
5. Based on the shape of the room, determine the airflow directions
for the installation site. See Figure 2.3 for the schematic on the
direction of airflow. If part of the air vent must be blocked, you may
insert an air baffle at the vent of the unit body to block the air flow.
See Figure 2.4.
>1000
Connect to
refrigerant
piping (liquid)
≥30mm
Connect to
refrigerant
piping (gas)
Panel
Air outlet
A (mm)
H (mm)
230
≥260
300
≥330
Unit body
Air baffle
Caution
The air baffle is not included. Please contact the sales agent
to purchase the wind deflector.
The air baffle must be installed in front of the installation panel.
If the panel is already installed, make sure you remove the
panel before you install the air baffle.

3. Indoor Unit Installation

Make sure that only specified components are used for the installation
works.
3.1 Installation with Lifting Bolts
Use different bolts for the installation depending on the installation
environment.
Wooden structure
Secure the square rod on the beam to set the hoisting bolts.
4
Figure 2.3
Figure 2.4
Square bar
material
Beam
Ceiling
Lifting bolt
Figure 3.1
V.2

Advertisement

Chapters

Table of Contents
loading

Table of Contents