Supplemental Installation Manual
IMPORTANT NOTES:
All installs are to be done by a journeymen electrician. If an apprentice is helping it is the journeyman's
responsibility to ensure all work is to building standards.
A lockable disconnect is required in a readily accessible location (CEC 625.42) for EV charging
stations > 60A or 150V to ground. The disconnect does not have to be fusible but must comply with
NEC regulations.

Advertisement

loading

Summary of Contents for Ford PRO

  • Page 1 Supplemental Installation Manual IMPORTANT NOTES: • All installs are to be done by a journeymen electrician. If an apprentice is helping it is the journeyman’s responsibility to ensure all work is to building standards. • A lockable disconnect is required in a readily accessible location (CEC 625.42) for EV charging stations >...
  • Page 2 In addition to the standard installation tools, you will be required to have a have a Hand Crimping Tool (Greenlee brand shown below or comparable), an Inch Pound Torque Screwdriver and a 6mm Tapping Tool. Before you begin your install make sure when unpackaging the unit that all equipment is on hand and has not been damage.
  • Page 3 Its important to note that regardless of a rear conductor entry or from the bottom the following steps be followed. Pre- bend conductors so they align with the appropriate terminals on the unit. This should be done prior to installing any high press lugs.