Connecting A Fire Department Operating Panel - Honeywell IQ8Control C Installation Instruction

Fire alarm control panel
Hide thumbs Also See for IQ8Control C:
Table of Contents

Advertisement

Fire Alarm Control Panel IQ8Control C/M

4.3.7 Connecting a fire department operating panel

X4
top
terminals
If the terminal IN8 (fire control off / revision) is not used, jumper BR21 must always be fitted at
position 2-3 !
Current load per output (OUT1 to OUT 8) max. 25 mA.
bottom
terminals
Fig. 44: Connection terminals fire department operating panel
50
bottom - terminals
top - terminals
X4
FD call LED on
(IN1 on GND)
(closer)
do not use
do not use
MB disconnected
acoustic signals off
check MB
reset FACP
fire control off / revision
do not use
fire control off (revision)
MB activation prevent
acoustic signals off
MB disconnected
common fire
extinguishing system activated
MB activated
X4
Wiring differs from area to area and is
governed by the requirements of the
regional fire department.
A 12 V DC voltage is required for
operation.
FB 798951.GB0 / 01.09

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Iq8control m

Table of Contents