CARTON CONTENTS
1. Tray
2 Wheel B rackets ( 2)
3 Middle Brace
4 HitchBracket
5 Tongue
6 EndPlates (2)
7 LiftHandle
8 LiftLever A ssembly
9. Single Spool A ssemblies ( 2)
10.Shaft
1t. Double Spool A ssemblies (2)
12.Wheels (2)
10
11
X
12
TOOLS
REQUIRED
FOR ASSEMBLY
(2) 7/t6" wrenches
(2) 1/2" wrenches
(2) 9/16" wrenches
(2) 3/4" wrenches or adjustable wrenches
*
Attach the lift lever assembly to the two holes in the
middle of the shaft using two 1/4" x 1-3/4" hex bolts
(B) and a 1/4" nyiock nuts (K). Tighten• See figure 1.
LIFT LEVER ASSEMBLY
1/4" NYLOCK
NUT (K)
1/4" x 1-3/4"
HEX BOLT (B)
FIGURE
1
CAUTION:
Points of aerator knives
are sharp! Exercise caution at all times
while assembling and using the aerator
•
Push split plastic bearings (Y) into both ends of all
single and double spool assemblies. See figure 2
SPLIT
BEARING (Y)
J
SPLIT
BEARING (Y)
SPLIT
[
BEARING (Y) ;_
/
/
\,
T
SPLIT
BEARING (Y)
FIGURE
2
4