2.4 No-Lift Loading/Unloading
The iN∫LINE fastening system holds the cot level with the patient floor
as the operators load it into the ambulance (Figure 1), or unload it from
the ambulance (Figure 2). During the loading and unloading process:
Do not lift the cot. Allow the legs to support the load.
Both operators work together to guide the cot into the iN∫LINE.
The Control-end Operator confirms each cot safety bar engages
the iN∫LINE safety hook.
Confirm the legs have clearance before extending or retracting.
Look for obstructions such as the ambulance bumper.
Follow the loading and unloading procedures in this manual.
Use additional help as needed (page 10).

2.5 Control the Load

At all times during rolling, both operators (and any helpers) keep both
hands on the main frame (or guide bar), support and balance the load,
and maintain control of the cot. Use care on rough or uneven terrain.
Roll the cot only at, or below, the maximum transport height. This
height is programmed into the cot. See "Rolling the iN∫X" on page 28.