Power Supply Cord; Main Switch - Leister TWINNY T7 Repair Instructions

Hot air welder
Table of Contents

Advertisement

5.3

power supply cord

Check power supply connections. Replace wires in case of wire break, short circuit or me-
chanical damages.
Note
Do not shorten the power supply cord! If the customer did so or if a third-party
cord is used, the power supply cord has to be replaced.
Check carefully the protective earth conductor for continuity.
5.4

Main switch

Check main switch
Repair instruction
TWINNY T7 / TWINNY T5
Revision B
Switch position "0" (OFF):
• Switch position "1" (ON):
Doc. Nr.
Revision
Stand
Created
Released
Modified
resistance > 1MΩ (OL)
resistance < 1Ω
INN_FO_29
1.1 PRI
25.02.2013
16.05.19 FLS
11.05.22 TSC
10.05.22 LG
Seite 21/62

Advertisement

Table of Contents
loading

This manual is also suitable for:

Twinny t5

Table of Contents