Operating

Power supply

When using an extension cable, take care to ensure the minimal cable cross-section:
Extension cables must be approved for the working environment (e.g. outdoors) and labelled
accordingly.
If a generator is used to supply electricity, the rated power of the generator must be 2x the
rated power of the hand extruder.

Starting procedure

Temperature monitoring prevents the hand extruder starting up in a cold state.
Display
Status display
for drive (30)
After switching on the main switch (1), the device directly heats up to the last adjusted set
values. When the set values are reached, a counter in the status indication counts back from
220 seconds to zero. Once this starting procedure has elapsed, the device is ready for welding
(status: Ready*). The operating temperature of the manual extruder is reached after approx.
5 minutes.
After a short-term mains break, the starting procedure is not repeated.
6
Length
Minimum cross-section (at ~230V) [mm
[m]
Up to 19
20 – 50
WARM-UP LOCK TIME: 220 SEK.
Heat
Heating until target
value is reached
2.5
4.0
motor disabled
2
]
FREE M
motor release
READY *
ready to weld