Remote Control Connection - Chroma 6330 Series Operation Manual

High speed dc electronic load
Table of Contents

Advertisement

Installation
6 A / 6 0 A . 1 6 V / 8 0 V . 3 0 0 W
6 A / 6 0 A . 1 6 V / 8 0 V . 3 0 0 W
2 A / 2 0 A . 1 6 V / 8 0 V . 1 0 0 W
2 A / 2 0 A . 1 6 V / 8 0 V . 1 0 0 W
M A I N F R A M E
Figure 2-6 Parallel Connection
2.6

Remote Control Connection

The remote operation of Load can be done through GPIB or RS-232C. These connectors on
the rear panel connect the Load to the controller or computer. The GPIB interface of the
electronic load is optional. The 6330 series Remote Controller can control load through
RS-232C port. Connect the Remote Controller to the Electronic Load before powering it on.
If you have not done this, Load will shut down, or the fuse for remote controller in Mainframe
will be broken.
2-7

Advertisement

Table of Contents
loading

This manual is also suitable for:

63346332

Table of Contents