Installing A New System; Unpacking - Avaya 40DHB0002UKCL Installation Manual

Table of Contents

Advertisement

Page 38 - Unpacking

Installing a New System

Unpacking

Before proceeding with installation, ensure that you have read the notes covered in
Preparing for Installation on page 32.
Unpacking and checking :
1. Before unpacking check for any signs of damage that has occurred during transit.
If any damage exists bring it to the attention of the carrier.
2. Check all cartons against the packing slip and ensure that you have the correct item as
per the country variants (see page 28).
Report any errors or omissions to the equipment supplier.
3. While unpacking the equipment, retain all the packaging material.
Fault returns are accepted only if repackaged in the original packaging.
4. Visually inspect each item and check that all the necessary documentation and
accessory items have been included. Report any errors or omissions to the dealer who
supplied the equipment.
5. Ensure you read and understand any documentation included with any item.
Page 38 - Installing a New System
Unpacking
Installing a New System
IP Office Installation Manual
40DHB0002UKCL – Issue 9 (28 October 2003)

Advertisement

Table of Contents
loading

Table of Contents