Cembre PCM-2P Operation And Maintenance Manual page 14

Machine for pandrol “e-clip” fastening
Table of Contents

Advertisement

4.5) Operation
Before use, always check:
– Integrity of the machine.
– The correct coupling of the units making up the machine.
– Correct connection of the quick couplings and the braking device.
– Correct level of oil in pump.
– For any oil leaks in the hydraulic circuit (radiator, hoses, pump).
– Flexible hoses are in good condition and show no signs of wear or crushing.
– Protection devices in the clamp areas are firm and show no signs of damage.
– That the engine fuel tank cap is tight. Petrol is highly inflammable and can explode.
– Start the engine (see § 5).
– With knob (27) released, push the machine to the E clips points on which operations are to
be performed (see § 4.2).
4.5.1) Simultaneous insertion of 2 E clips
Make sure the the locking knob (27) of the wheel is released (see § 4.2).
– Position the E clips in the retention plate eyelets, on both sides of the rail.
FIG. 10
– Make sure the teeth (33) of the clamps are moved fully back by pulling the control lever to
the left "EXTRACT".
– Completely lower the machine, positioning the yellow locator plates (36) near the E clip
retention plates (see Fig. 11a)
FIG. 11a
36
E clip retention plate
(Ref. to Figs. 10 -11)
E clips
33
14

Advertisement

Table of Contents
loading

Table of Contents