JLG 800AJ HC3 Operation & Safety Manual page 75

Table of Contents

Advertisement

To avoid a collision and injury if platform does not stop when a control switch or
lever is released, remove foot from footswitch or use emergency stop switch to
stop the machine.
4.11.1
Swinging the Boom
To swing boom, use Swing control switch to select Right or Left direction.
When swinging the boom make sure there is ample room for the boom to clear
surrounding walls, partitions and equipment.
Note: On CE/UKCA Market machines, when boom functions are being operated there
is an interlock that prevents the use of Drive and Steer functions.
4.11.2
Raising and Lowering the Tower Boom
This machine has two controls for the tower boom (two toggle switches), one controls
tower lift, the other tower telescope. The switching system will sequence its Lift and
Telescope functions as follows:
800AJ HC3
CAUTION
NOTICE
31222411
Machine Operation
75

Advertisement

Table of Contents
loading

Table of Contents