JLG 800AJ HC3 Operation & Safety Manual page 71

Table of Contents

Advertisement

Machine Operation
NOTICE
If the boom is over the front (steer) axle, direction of steer and drive movement will
be opposite from the movement of the controls.
Figure 11. Grade and Sideslope
71
800AJ HC3
31222411

Advertisement

Table of Contents
loading

Table of Contents