Preparing The Vehicle - Fayat Group DYNAPAC SD2550C Operating Instructions Manual

Paver finisher
Table of Contents

Advertisement

3.5

Preparing the vehicle

4
2
After the vehicle has been positioned on the low-loader, the following preparations
must be carried out:
- For movable platform: Set the retaining bolt properly (1).
- Close the hopper and set the hopper transport safeguards (2) on both sides.
- Position the non-slip mats under the screed across the whole width of the vehicle (3)
and lower the screed.
- Switch off the paver finisher.
- Attach and secure the protective hood (4) to the operating panel.
- Lower the roof and set the retainers (5) properly on both sides.
- Fold up the walkway plates of the screed and fasten on both sides using lashing
straps (6) and any possibly existing hook springs (7).
C 11 8
1
3
5
6
7

Advertisement

Table of Contents
loading

This manual is also suitable for:

Dynapac sd2550cs894895

Table of Contents