Installation And Operation - Fayat Group DYNAPAC SD2550C Operating Instructions Manual

Paver finisher
Table of Contents

Advertisement

Installation and operation

CAUTION
CAUTION
- Mount the bracket (1) on the B-pillar on the left / right of the control platform.
Firmly tighten the clamping bolts (2).
- Fasten the illuminated balloon (3) to the holding tube (4) and pull the clamping
lever (5) tight.
- Guide the holding tube (4) into the premounted holder (1) and tighten the screws (6)
correctly to fix the holding tube.
- Then clamp the balloon before commissioning by pulling it down firmly with one
hand at the handle (7) marked with a green pennant.
When the balloon has been pulled down completely up to the stop, a safety
catch (8) folds out of the guide rod.
- Once the illuminated balloon is completely mounted, aligned and secured,
connect the plug (9) of the illuminated balloon in the corresponding switch cabinet
sockets (10).
m
Never adjust the holding tube while the illuminated balloon is in operation.
Operation of the switch cabinet - see screed operating instructions.
A
m
Route the supply lines so as to rule out any risk of stumbling or damage to the lines.
Danger due to electric shock
Electric shock can lead to serious injuries or death
- Always wait to connect the Powermoon to the power
supply and switch it on until after it has been completely
unpacked, assembled and aligned.
Danger of squeezing!
Fingers or hands can be pinched between the bracket and
holding tube!
- Exercise caution when fitting the holding tube!
D 30 43

Advertisement

Table of Contents
loading

This manual is also suitable for:

Dynapac sd2550cs894895

Table of Contents