Interrupting/Terminating Operation; During Breaks In Paving (E.g. Delay Due To Material Trucks); During Longer Breaks (E.g. Lunch Break) - Fayat Group DYNAPAC SD2550C Operating Instructions Manual

Paver finisher
Table of Contents

Advertisement

1.7

Interrupting/terminating operation

During breaks in paving (e.g. delay due to material trucks)

- Determine the approximate duration.
- When cooling down of the material below the minimum paving temperature must be
expected, run the paver finisher empty and create an edge like the end of a layer.
- Set the drive lever (13) to the centre position.

During longer breaks (e.g. lunch break)

- Set the drive lever (13) to the centre position and the speed adjuster (15)
to minimum.
- Press the stop button (12) to switch off the engine.
- Switch off the ignition (11).
- Switch the screed heater system off.
- With a screed with gas heating system (o), close the bottle valves.
The screed must be heated up to the correct paving temperature before paving may
A
be restarted.
D 41 35

Advertisement

Table of Contents
loading

This manual is also suitable for:

Dynapac sd2550cs894895

Table of Contents