Maytag Commercial MDG28PD Installation Instructions Manual page 13

Commercial he dryer gas
Table of Contents

Advertisement

Available languages

Available languages

VENTING REQUIREMENTS
Vent Hoods
102 mm (4") Diameter Exhaust Hoods
Box hood
Louvered hood
Vent System Length
Maximum Vent Length/Vent Connection
Maximum length of vent system depends upon the type of vent
used, number of elbows, and type of exhaust hood.
Vent System Chart (Rigid Metal Vent)
Box and
No. of 90˚ Turns
Louvered Hood
0
39.6 m (130 ft)
1
38.1 m (125 ft)
2
35.1 m (115 ft)
3
32.3 m (106 ft)
4
29.9 m (98 ft)
For vent systems not covered by the "Vent System Chart,"
see your parts distributor.
Provision must be made for enough air for combustion
and ventilation. (Check governing codes and ordinances.)
See "Recessed Area and Closet Installation Instructions"
in the "Location" section.
A 102 mm (4") outlet hood is preferred. However,
a 64 mm (2
") outlet exhaust hood may be used.
1
2
A 64 mm (2
") outlet creates greater back pressure than
1
2
other hood types. For permanent installation, a stationary vent
system is required.
Connect Vent
1. If connecting to existing vent, make sure the vent is clean.
2. Using a 102 mm (4") clamp, connect vent to exhaust outlet
in dryer.
Exhaust hood must be at least 305 mm (12") from the ground
or any object that may be in the path of the exhaust (such as
flowers, rocks, bushes, or snow).
Angled hood
NOTE: Do not remove vent collar.
Angled Hood
39.3 m (129 ft)
36.3 m (119 ft)
33.2 m (109 ft)
30.5 m (100 ft)
3. Tighten hose clamp with Phillips screwdriver.
28.0 m (92 ft)
4. Make sure the vent is secured to exhaust hood with
a 102 mm (4") clamp.
5. Move dryer into final position. Do not crush or kink vent.
Make sure dryer is level.
Vent collar
305 mm minimum
12" min.
(12")
(305 mm)
13

Advertisement

Table of Contents
loading

This manual is also suitable for:

Mdg28pnMdg28pr

Table of Contents