Exhaust Venting And Air Intake - IBC SL 28-160 Installation And Operating Instructions Manual

Modulating gas boiler
Table of Contents

Advertisement

WARNING
Exposed water piping and
associated components
(relief valves, circulators, etc.)
should not be in contact with
combustible materials. Check
local codes for required
clearances and/or provide
adequate insulation.
WARNING
DO NOT MOUNT THIS
BOILER TO HOLLOW
WALL STRUCTURES - The
combined weight of the
boiler, its water contents
and associated piping
components can exceed 225
pounds. Fasteners must be
rated for this strain, and must
be firmly anchored into solid
material that will support this
weight.
Installers are to take all
necessary precautions
to avoid injury during the
installation of this boiler.
DANGER
Do not common vent the SL
modulating series boilers
with any other existing or new
appliance.
INSTALLATION
SL 28-160 MODULATING GAS BOILER
contaminants; combustion air should be drawn from a CLEAN source (e.g.
outdoors) and the boiler should be isolated from interior dust sources.
SURFACE
Front
Rear
Left Side
Right Side
Top
Bottom
Table 2 - Clearance from boiler cabinet
A minimum distance below the boiler of 12" is required to provide
clearance for the supplied condensation trap assembly. More clearance will
typically be required to accommodate associated water and gas piping.
Figure 2: Wall mounting of boiler
1.4

EXHAUST VENTING AND AIR INTAKE

It is important to carefully plan the installation to ensure the appropriate
vent materials, travel and termination decisions are incorporated. Specific
attention is warranted to manage the impact of the steam plume normally
experienced at the exhaust terminal of a condensing boiler. Generally,
intake and exhaust pipes should terminate at a rooftop or sterile wall
location, to maximize customer satisfaction. Keep exhaust plumes
well away from all building air intakes including those of neighbouring
properties.
DISTANCE FROM
RECOMMENDED DISTANCE FOR
COMBUSTIBLE
INSTALLATION AND
SURFACES
SERVICE
2"
24"
0"
0"
1"
4" (min. for piping clearance)
1"
4" (min. for piping clearance)
2"
6" (for vent connection)
0"
12" (for condensate trap)
1-3

Advertisement

Table of Contents
loading

Table of Contents