IBC SL 28-160 Installation And Operating Instructions Manual page 27

Modulating gas boiler
Table of Contents

Advertisement

NOTE
The piping drawings in this
manual are simple schematic
guides to a successful
installation. There are many
necessary components not
shown, and details such as
thermal traps are left out so
the drawings have greater
clarity. We require that
our boilers be installed by
licensed and experienced
trades people who are familiar
with the applicable local
and national codes. System
design is to be completed
by an experienced hydronic
designer or Engineer. It is
necessary to carefully read
and follow these installation
instructions along with the
application drawing that fits
your system.
NOTE
SL 28-160 boilers are
equipped with a factory
installed pressure sensor-
type Low Water Cut Off. The
minimum operating system
pressure allowable with this
is 4 psig. Check local codes
if a Low Water Cutoff Device
is required. If so, determine
if this device meets the local
codes.
INSTALLATION
SL 28-160 MODULATING GAS BOILER
Figure 27: Basic Primary/Secondary piping with closely-spaced tees concept
Figure 28: Important Primary/Secondary piping details with closely-spaced tees
1-23

Advertisement

Table of Contents
loading

Table of Contents