Installation

7
7.1

Cable routing

For cable routing we recommend the use of fire protected cables retaining their function E90 or E30.
See also chapter 8 "Cable dimensioning" in this instruction.
However, this has to be agreed with the Engineer or, if necessary, with the local fire protection department.
Do not reduce the cable cross sections specified in the cable lengths table.
All cables of the control (except the mains supply cable) carry 24V DC and
have to be routed separate from the mains supply cable. Adhere to the
pertinent national and local regulations when routing the cables.
Lead the connection cables into the housing of the control panel from above
and the cable glans shall comply with fire class V-1 (IEC/EN 60695-11-20 / UL
94) or higher and be in accordance with national and local regulations.
Ensure that the mains cable can be switched via an external or customer-supplied
two-pole switch element or a switch element controlling all poles – see drawing.
7.2

Cables into housing

All connection terminals (except the mains terminals) are of the plug-in type.
Connect the connection cables in accordance with the terminal plan. Ensure that the connections are made correctly.
Incorrect cable clamping, mixing up numbers or colours could lead to malfunctions of the control panel or of the external
components.
Ensure that the electrical cables are always routed according to the valid national and local regulations.
7.3

Connection of safety earth wire and 230V AC

See chapter 9 "Description of card and mains connection" for further description.
7.4

Installation of the break glass unit, ventilation keypad and smoke detector

Ensure that the break glass unit and the ventilation buttons are visible and well accessible. Do not install behind protruding
walls, door panels or hidden by the building structure.
Note: Installation height of the break glass unit 1.5 – 1.7m above floor.
Install the smoke detectors in accordance with their enclosed instructions.
7.5

Assembly instructions

Always have assembly, installation, repair and maintenance of smoke and heat extraction systems carried out by
qualified personnel trained for this purpose.
Rules to be adhered to for setting up and installation
The following safety relevant rules must be adhered to when planning the use of a smoke and heat extraction system and its
set-up and installation:
The Provincial Building Ordinance of the provinces,
The regulations of the competent fire protection authority,
Accident prevention regulations
Adhere to the general accident prevention regulations (APR), the APR for power operated windows and doors, and the
installation rules in your country.
CAUTION:
Live components are directly accessible after opening the system housing.
Prior to inserting / removing cards disconnect to the panel from the mains supply and the back-up batteries.
adhere to the installation instructions and your local energy providers
select the place of installation such that free access is guaranteed for maintenance purposes
select cables according to regulations in this instruction - take the calculation of the actuator supply cable lengths
into account when laying the cables
power cables entered via the cable glands
connect the cables in accordance with the drawings provided by the manufacturer
route the cables in the building according to the regulations in this instruction
after the smoke panel is installed the back-up batteries will be fully charged after ca. 8 hours
check all system functions
Electric cable routing for smoke and heat extraction systems
Electrical cables must be laid in accordance with the national and local rules in your country.
Do not use the PE wire / green/yellow wire!
Cables of type NYM, concealed, can be used.
For surface laying, halogen free safety cables are recommended (see cable plan).
If possible, the use of cable types should be agreed with the Technical Services and the competent fire protection authority.
For the maximum permissible cable lengths of the actuator supply cables for the WSC 104 system, taking the specified cable
cross sections into account (cable information for surface laying), please refer to chapter 8 "Cable dimensioning".