Commissioning And Test Run; Blown Fuses - 6.3A Slow; The Control Ventilation Panel Is Completely Installed, Without The Operating Voltage Applied; With Mains Voltage, Without Accumulator - Window Master CompactSmoke WSC 104 S AR Installation Instructions Manual

Table of Contents

Advertisement

15.1.1 Blown fuses – 6.3A slow
An error on the "Battery status" can also be triggered if the battery-fuse (6.3A slow) is blown.
Additionally, an error on the motor line status can be triggered if the motor line-fuse (6.3A slow) is blown.
The battery-fuse is located in the bottom right
above the connection to the back-up battery.
The motor line-fuse is located below the actuator
output.
Both fuses are type:
Cartridge, Time Delay, 6.3 A, 250 V, 5mm x 20mm

Commissioning and test run

16
In case of hardware error please see section 15 "'Hardware error". To configure the smoke panel press „↑" and „↓" (on the main
card) at the same time for 5-10 seconds, see section 13.
The break glass unit WSK 50x will only give an acoustic fault signal if the door on the break glass unit is closed or if the door
contact on the break glass unit is pressed.
We recommend that the software of the panel is updated during the annual maintenance check!
We recommend that the commissioning of the smoke panel should be done by a competent smoke ventilation controls installer.
16.1
The control ventilation panel is completely installed, without the operating
voltage applied
a) Check all mechanical and electrical components for damage.
b) Check all screw and plug connections for tightness and/or firm seating
c) Check that all external components are installed:
1) ±24V actuators: Is the motor end module inserted in the last or only actuator?
2) Automatic smoke detectors: Is the passive end module inserted in the last or only smoke detector?
16.2

With mains voltage, without accumulator

Adhere to the relevant regulations!
Connect the mains cables and reapply the mains voltage.
16.3

With mains voltage, with accumulator

a) Remove the protection film from one face of the supplied foam rubber. Glue each foam rubber to the bottom side of the
accumulators. Connect the accumulators to the black accumulator bridge according to the wiring diagram, then connect the
red and the black connection cable to the red and the black flat plug. Remove the bottom protection film of the foam rubber
and insert the batteries in the smoke ventilation panel according to section 12, and firmly press down to the housing bottom!
b) Plug the red connection cable to the + and the black connection to the flat plug of the control panel.
Note: Check correct polarity!
16.4

Ventilation keypad

Closely observe the actuators during opening and closing. They must not be impaired in any position by the building structure.
Observe that the actuator cables are not being subject to pulling or pinching.
Check each ventilation keypad individually.
16.5

Break glass unit WSK 50x

a) Open the door and press the black Open button. The actuators move open through to the end position. The red alarm LED
(also in the control panel) is ON; at the same time a permanent acoustic signal sounds (door contact on the break glass unit
is pressed!).
b) Press the Reset/Closed button in the break glass unit. The actuators close through to the end position. The comfort
ventilation function is released again. The red alarm LED (also in the smoke ventilation panel) and the acoustic smoke alarm
are turned off.
Location of 6.3A slow fuses