ATEN CL5800 - Dual Rail LCD Console Quick Start Guide

ATEN CL5800 - Dual Rail LCD Console Quick Start Guide

Also See for CL5800:

Advertisement

ATEN CL5800 - Dual Rail LCD Console Quick Start Guide

Package Contents

1 CL5800 Dual Rail LCD PS/2–USB Console with Standard Rack Mount Kit
1 custom KVM cable
1 power cord
1 firmware upgrade cable
1 extension kit
1 user instructions

Hardware Overview

Front View
Hardware Overview - Part 1 - Front View
Press the Exit/Light push button for two seconds to turn the LED light ON or Off. (Default: On)

  1. upper handle
  2. LCD module
  3. keyboard module
  4. lower handle
  5. power LED
  6. LCD release catch
  7. rack mounting tabs
  8. LED illumination light

Keyboard Module
Hardware Overview - Part 2 - Keyboard Module

  1. keyboard release catch
  2. reset button
  3. lock LEDs
  4. keyboard
  5. touch pad
  6. USB port

LCD Module
Hardware Overview - Part 3 - LCD Module

  1. LCD display
  2. LCD controls
  3. LCD on / off button
  4. firmware upgrade port
  5. firmware upgrade switch

Rear View
Hardware Overview - Part 4 - Rear View

  1. power socket
  2. power switch
  3. external console section
  4. KVM port section

Installation

Standard Rack Mount

A standard rack mount kit is provided with your CL5800. The kit enables the switch to be mounted in rack with a depth of 52-85cm.
To rack mount the CL5800, do the following:

  1. While the fi rst person still holds the CL5800 in place, the second person slides the L brackets into the CL5800's side mounting brackets from the rear until the bracket fl anges contact the rack, then screws the L brackets to the rack.
  2. After the L brackets have been secured, tighten the front bracket screws.

Front-L Bracket Mount
(Optional)
Installation - Front-L Bracket Mount
To have a comfortable and safe posture, install the Front-L brackets which provide an extension at the front of the rack to help the unit slide further out and thus allowing you to tilt the LCD screen more.

  1. Attach the left and right Front-L brackets to the front of the rack, placing screws in the tabs to secure them in place.
    Note: Rack screws are not provided to mount the unit. We recommend that you use two M5 x P0.8 screws on each side.
  2. Have one person position the unit in the rack and hold it steady. Have the second person screw the front brackets to the Front-L bracket.
    Note: Rack screws are. not provided to mount the unit. We recommend that you use one M5 x P0.8 screws on each side.
  3. While the fi rst person still holds the unit in place, the second person slides the left and right L-shaped brackets into the unit's side mounting brackets from the rear, installing four screws in the brackets to secure them in place.
  4. After the L-shaped brackets are secured, tighten all the screws. Allow at least 5.1 cm on each side for proper ventilation, and at least 12.7 cm at the back for the power cord and cable clearance.

Single Stage Installation
Single Stage Installation

  1. Plug the SPHD connector end of a KVM cable into the LCD Console's KVM port.
  2. Plug the keyboard, monitor, and mouse connectors of the KVM cable into their respective ports on the Console Section of a KVM switch.
  3. If you are installing an external console, plug your keyboard, monitor, and mouse into their respective ports on the Console Section of the LCD Console. The ports are color coded and marked with an icon for easy identifi cation.
  4. Plug the CL5800's power cord into the LCD Console's power socket and into a power source.
  5. Power up your KVM installation.
  6. Turn on the power to LCD Console.

Operation

Opening the Console
Operation - Opening the Console

  1. Pull the release catches to release the console, and pull the top panel a few centimeters toward you.
  2. Reach underneath and pull the keyboard module all the way out until it clicks into place.

Closing the Console
Operation - Closing the Console

  1. Pull the release catches located on either side of the keyboard toward you to release the keyboard module, then slide the module slightly in.
  2. Rotate the LCD module all the way down, then pull the rear catches to release the LCD module.

Technical Support
www.aten.com/support

Scan for more information
Product Page

Documents / Resources

Download manual

Here you can download full pdf version of manual, it may contain additional safety instructions, warranty information, FCC rules, etc.

Download ATEN CL5800 - Dual Rail LCD Console Quick Start Guide

Advertisement

Need help?

Need help?

Do you have a question about the CL5800 and is the answer not in the manual?

Questions and answers

Table of Contents