Download Print this page

Arrow AT101 Owner's Manual & Assembly Instructions page 3

Universal attic kit

Advertisement

Step 2
1
Install two posts at the rear corner
of building by removing the two fas-
teners in the framework. Interlock the
two posts and telescope them to the
proper length between the upper and
mid wall frames. Tabs on ends of
posts go behind frames. Reinsert top
and bottom fasteners. Fasten posts
together using a bolt and nut at the
center of posts.
2
Install the next two posts at either
26 3/8", 27 3/8" or 28 3/4" dimension
(depending on your building) toward
the front and remove the two fasten-
ers as before. When complete, re-
peat procedure on the opposite side
of building in the same manner.
REMOVE AND REINSERT
FASTENER
FOR BUILDINGS WITH NO MID WALL FRAME:
Install posts in the same manner. Using hole in bottom tab on post as a guide,
drill 1/4" diameter hole through side wall panel and fasten with a bolt and nut.
26 3/8" (67 cm)
27 3/8" (70 cm)
28 3/4" (73 cm)
POST 8225
TAB
REAR
FRONT
REAR

Advertisement

loading