Before installation
Before installation
Install correctly according to the installation manual.
Pipes/Wires/Small parts
Accessory items
Accessory item
For unit hanging
For refrigerant pipe
Flat washer (M10) Paper pattern Pipe cover (large) Pipe cover (small)
Strap
8
1
1
1
4
For unit hanging
For heat insulation
For heat insulation
For unit hanging
of liquid pipe
cover
and adjustment
of gas pipe
Selection of installation location for the indoor unit
➀ Select the suitable areas to install the unit under approval of the user.
Suggest to the user to use a circulator if the ceiling height is over 3m to
avoid warm air being accumulated on the ceiling.
・In case of having the motion sensor, the installation height must be no higher than
4 m. It could reduce the sensitivity of motion sensor, disabling the detection.
・Areas where there is enough space to install and service.
・Areas where it can be drained properly. Areas where drain pipe descend-
ing slope can be taken.
・Areas where the supply air does not short-circuit.
・Areas not exposed to direct sunlight.
・Areas where dew point is lower than around 28°C and relative humidity is lower than 80%.
This indoor unit is tested under the condition of JIS (Japan Industrial Standard) high
condensation drop if the air-conditioner is operated under the severer condition than
mentioned above.
If there is a possibility to use it under such a condition, attach additional insulation of
10 to 20mm thick for entire surface of indoor unit, refrigeration pipe and drain pipe.
・Areas where TV and radio stays away more than 1m. (It could cause jamming and noise.)
・Areas where any items which will be damaged by getting wet are not placed
such as food, table wares, server, or medical equipment under the unit.
・Areas where not exposed to oil mist, powder and/or steam directly such as above fryer.
doesn't affect the operation.
(A beam from lighting device sometimes affects the infrared receiver for the
wireless remote control and the air-conditioner might not work properly.)
➁ Check if the place where the air-conditioner is installed can hold the weight of the unit.
If it is not able to hold, reinforce the structure with boards and beams strong enough
to hold it. If the strength is not enough, it could cause injury due to unit falling.
➂ If there are 2 units of wireless type, keep them away for more than 6m to avoid
malfunction due to cross communication.
➃ When plural indoor units are installed nearby, it is recommended to separate each
other more than 4m.
Space for installation and service
4000mm or more (Recommended)
100mm
or more
300mm or more
150mm or more
2500mm or more
Obstacle
Floor
Preparation before installation
If suspension bolt becomes longer, do reinforcement of earthquake resistant.
For grid ceiling
When suspension bolt length is over 500mm, or the gap between the ceiling
and roof is over 700mm, apply earthquake resistant brace to the bolt.
In case the unit is hanged directly from the slab and is installed on the
ceiling plane which has enough strength.
When suspension bolt length is over 1000mm, apply the earthquake resistant brace to the bolt.
Prepare four (4) sets of suspension bolt, nut and spring washer (M10) on site.
Pitch of suspension bolts and pipe position
Pitch of suspension bolts
(mm)
A
24
B
24
Blowout opening
Wall
Air return grille
Accessories
are inside.
For drain pipe
For air return grille
Drain hose
Hose clamp Fixing bracket
Screw
Heay insulation
(with clamp)
1
1
1
2
1
For drain pipe
For drain hose
For installing of
For drain hose
mounting
drain hose
connection
return grille
-
・ In case of not installing in the above installation
inhalation of the blow out wind, it could reduce
the capability or cause the thermostat OFF.
・ Install the indoor unit at a height of more than
5mm or more
Location of pipe outlets
(mm)
Top cover
Drain line
Drain line
(rear left)
Top outlet
Right outlet
98
Rear cover
Rear outlet
Cutout parts
Preparation before installation (continued)
Series
type
40 to 50type
Single Split (PAC)
60 to 71type
series
100 to 140type
36 to 56type
VRF (KX) series
71type
112 to 140type
Screw
Pipe position
(mm)
235(Liquid piping)
135
Refrigerant line
75
Liquid
195(Gas piping)
piping
4
Unit interior
271
110
10 mm slope
Haulage
Move the box as close to the installation area as possible packed.
If it must be unpacked, wrap the unit with a nylon sling,
and be careful not to damage the unit.
Do not hold fragile plastic parts, such as the side panel,
blow louver, etc.
put it with the intake grille facing upward.
Preparation before instalation
1. Remove the air return grille.
Slide stoppers (4 places) of the catches,
then pull out the pins ( 4 or 6 places).
3. Remove the hanging plate.
Remove the screw, and then loosen
Unscrew
8-12mm
Hanging plate
Installation of indoor unit
WARNING
Completely seal the hole in the wall with putty.
If not sealed properly, dust, insects, small
animals, and highly humid air may enter the
room from outside, which could result in fire
or other hazards.
Work procedure
1. Select the suspension bolt locations and the pipe hole location.
(1) Use enclosed paper pattern as a reference, and
drill the holes for the suspension bolts and pipe.
Decide the locations based on direct measurements.
(2) Once the locations are properly placed, the paper
pattern can be removed.
2. Install the suspension bolts in place.
3. Fix with 4 suspension bolts.
4. Check the measurements given at the right
5. Fasten the hanging plate onto the suspension bolts.
<
When installed against a ceiling material,
Air supply
Fasten
at the
front
end of
an
elon-
gated
Hanging plate
hole.
6. Install the unit to the hanging plate.
(1) Slide the unit in from front side to get it
hanged on the hanging plate with the bolts.
(3) Fasten the two screws (M4: 1 each on
the left and right sides).
(left)
WARNINIG : Hang a side panel on from the
panel side to the rear side and
then fasten it securely onto
the indoor unit with screws.
a descending slope toward the drain outlet.
CAUTION : Do not give the reversed slope, which may cause water leaks.
- 73 -
158
-
-
'21 • PAC-T-390
'21 • PAC-SM-383
※Pipes can be taken out in 3 directions (rear, right or
(mm)
top).
A
B
・ Cut out holes using nippers, etc.
1070
1022
・ Cut out holes to take out pipes along the cutoff line
1320
1272
on the rear cover.
1620
1572
・ Cut out the top face cover aligning to the piping
1070
1022
position.
1320
1272
・ When taking pipe out to right-hand side, cut out a
hole along the groove at the inside of side panel.
1620
1572
・ After installing pipes and wires, seal clearances
around pipes and wires with putty, etc. to shut off
dust.
Gas
piping
Make sure to install the covers at rear and top in order to
Drain piping (left)
protect the inside of unit from intrusion of dust or protect
wires from damages by sharp edges. When taking them
out to the right-hand side, remove burrs or sharp edges
from the cutout.
76
Drain piping
(right)
2. Remove the side panel.
Remove the screw and detach the
side panel by sliding it toward the
direction indicated by the arrow mark.
Filter
Side panel screw
Pin
(1 each on the left and right) (M4)
Side panel
Hanging plate
screw(M4)
Indoor
Hanging
unit
bolts(M8)
Hanging plate
CAUTION
Completely seal the hole in the wall
with putty.
If not sealed properly, furniture and
other fixtures may be damaged by
water leakage or condensation.
>
<
No ceiling material to install against,
Suspension bolt
Hanging plate
Unit
Ceiling surface
Unit
Washer
(accessory)
※Double nuts
Hanging plate
Fixing bolts
(M8)
(For left-side drain
connection, give the
reverse slope.)
Grille upside
(Indoor unit)
Indoor
Outdoor
side
side
putty
putty
Paper pattern
Ceiling
Hanging plate
Suspension bolt
>
Suspension bolt
Nut
Washer
(accessory)
※Double nuts
Screw for
hanging
plate (M4)

Hide quick links:

Advertisement

Table of Contents