QUICKSTART "BASIC" GUIDELINES FOR MODEL 9200 "FULL OPEN": MOUNTED ON THE PEDESTAL MOUNTING STAND
Fits on All 9200 Models.
Standard with 9230, 9235, 9240 and 9245 Models
Assemble Pedestal
Mounting Stand
See instruction
sheet with
i n g
o r K
b e r
pedestal kit
D o
u m
r t N
for assembly.
5
- 1 3
P a
0 0
9 2
Concrete Pad
4"
1.75"
Dimensions,
Pedestal
Conduit
11.75"
Area
Mounting
22"
11.75"
15.75"
11.75"
Stand and
Conduit
4"
Positions
6.25"
4"
Concrete Pad
39.25"
Opening
direction
Operator MUST be parallel to gate!
OFF setting.
Gate
C
1"
Chain
Idler Wheels
Bracket
Bracket
Chain brackets MUST align with
Conduit
idler wheels so chain stays
Operator Base Plate
parallel to gate!
1/2
Concrete Pad
Attach pedestal
stand with sixteen (16) 1/2" x 3"
sleeve anchors (not supplied)
Pedestal mounting stand
after concrete pad has been
MUST be level!
poured and has cured.
Chain
Warning
Configuration
Chain brackets MUST
Signs
be mounted so the
chain remains the
Permanently
mount signs on
same height as it is
BOTH sides of the gate
on the idler wheels!
area and make sure
they are easily visible.
Chain
Chain
Access
Access
Chain
Idler
Door
Bracket
Door
Wheels
10.5"
10.5"
10.5"
10.5"
4"
Wire
Concrete Pad
Min.
Mesh
3/4"conduit with
sweeps recommended.
Pad depth is determined by soil conditions and local building codes.
Minimum depth is 18 inches. Reinforced concrete recommended.
M a
Caution:
n u
c r a
a l
n k
Never
s t o
i n
r e d
attempt to
p o
s i t i
1
manually
o n
.
operate the
9200 until
you have
2
verified that
power has
been shut-off.
3
s
Gain Access Inside Operator
e e l
W h
e r
I d l
Remove the 3 locknuts inside the
electronic box to swing box open.
Move the idler wheels to the lower position.
Connect
Concrete pad
Chain to
MUST be level!
the Gate
n 1
t i o
O p
n 2
t i o
O p
Opening
Top
Chain
direction
Nut
Views
ON setting.
Chain Bolt
C
Chain nut
and chain bolt
Chain
should not protrude
past gate frame. The chain
should sag no more than one
(1) inch per 10 feet of travel. Do not
over tighten the chain.
"Optional" Chain
Tray Kit:
Recommended for
gates longer than 20
Side
ft. to support the
weight of the chain.
Views
DoorKing offers a
chain tray and
supporting brackets
in 10 ft. sections to
12 Sets
1"
fit any length gate
Washer
Washer
(DoorKing Part
Lockwasher
Number 2601-270,
Bolt operator to
10 Ft. section). See
pedestal with
Chain
instruction sheet
hardware supplied
Tray
with chain tray kit
in pedestal kit.
for installation.
Two 115 VAC Convenience Outlets
Limit Switches
2
1
2
3
1
4
2
3
1
4
3
4
10
4-0
440
i t
i m
1 L
h
i t c
1
1
S w
DANGER
HIGH VOLTAGE!
A
CAUTION
High Voltage AC input power MUST MATCH
e n
the operator specifications or DAMAGE will
l O p
Chassis
r t i a
occur and VOID the warranty!
Ground
P a
s e d
t U
DO NOT
power up and
N o
cycle the operator until
the "DIP-Switches" and
the "Limit Switches"
have been adjusted.
Damage could occur to
2 2 2 2
2
the gate and operator.
i t
i m
2 L
h
i t c
Speed Control Knob
S w
On all models but 9210.
With power OFF, push and hold the
lock plate down where shown to
9410
adjust the Open and Close limit nuts.
Plug-In Loop
After adjusting the limit-nuts, be sure
Detector
that the lock-plate is engaged in the
slots on the limit-nuts to prevent them
from rotating.
The slow-down limits on all models
but the 9210 will move up or down
3/4 inch. DO NOT remove the
slow-down limit assembly from the
3/4 inch slot and re-attach it in the
4404-018
longer slot on the partial open
adjustment rail to gain further
adjustment. This will cause mechani-
cal damage to the switch assembly
when the operator is activated.
Turn power ON and activate the gate
operator. Re-adjust the limit nuts as
See reverse side to wire terminals.
necessary for full-open and full-close
20 19 18 17 16 15 14 13 12 11 10 9 8 7
gate travel. After you are satisfied with
the gate limit settings, the speed
control knob can then be adjusted on
all models but the 9210 to personal
preference.
Copyright 2019 DoorKing
®
, Inc. All rights reserved.
UL 325 August
2018 Standard
Power safety and
opening devices
Entrapment Protection must be provided for the gate system where the risk
that require 115
of entrapment or obstruction exists. The operator will NOT run without one
or more monitored type B1 or B2 external entrapment protection devices in
VAC power.
EACH direction of gate travel (minimum of 2 external devices required).
This vehicular gate operator is designed for Class III and Class IV applications only and
must never be used in applications serving the general public.
For safety and installation instructions, please refer to the Installation/Owner's manual.
High Voltage Connection
GATE OPERATOR MUST BE PROPERLY GROUNDED!!
115 VAC Convenience Outlets
Tip: It is recommended that a surge suppressor be installed on the high voltage
power lines.
Anti-Grounding Plate
Chassis
L1 L2/N
B- B+
Ground
PE
High
1.0
Voltage
EPM
AC Input
Wire
Mode
VERIFY Input AC power MATCHES your
specific operator power BEFORE wiring!
SCM series
Check polarity of Three Phase:
basic I/O control
Position the gate half way open. Give
Min Max
Speed
open command and while gate is
1 ft/s
opening, activate the appropriate limit
.5 ft/s
1.5 ft/s
switch with your finger. Gate should
STOP. If it does not, activate the other
U
V
W PE PE
0 ft/s
2 ft/s
limit switch. If this STOPS the gate, AC
power wires must be changed (Reverse
the connection of any 2 wires and
re-check limits).
9410
Plug-In Loop
Detector
1
1A
2A
2
Limit LEDs
D
B
See reverse side
Plug-In Loop Detectors
Not included - Refer to the Installation/Owner's manual AND
Loop Information Manual (available from www.doorking.com)
6 5 4 3 2 1
for more information on loops and plug-in loop detectors.
Important Note:
loop detectors are installed with this slide gate operator. A loop
detection system will preventing the gate from automatically
opening or closing on a vehicle when it is in the gate's path.
120 S. Glasgow Avenue
Inglewood, California 90301
U.S.A.
A
A
Hot
Neu
Hot
Hot
Hot
115 VAC Output
115 VAC Output
115 VAC
Chassis
Ground
208/230 VAC
SINGLE Phase
SINGLE Phase
White - Neutral
High
Use only two legs
Black - 115 VAC Hot
Voltage
of the incoming
AC Input
Green - Chassis
Ground
Wire
3-phase power.
A
Hot
Hot
Hot
115 VAC Output
Chassis
208/230 VAC
Ground
High
THREE Phase
Voltage
AC Input
Wire
DIP-Switches
SW 1 and 2 are Upside-Down on Circuit Board.
B
SW 2
SW 1
Auto-Close Timer
D
1
23
C
Adjust 1 to 23 sec.
DoorKing highly recommends that loops and
9240-066-L-11-19

Advertisement

loading

Summary of Contents for DoorKing FULL OPEN 9200

  • Page 1 Loop Information Manual (available from www.doorking.com) 20 19 18 17 16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1 gate travel. After you are satisfied with for installation.
  • Page 2 QUICKSTART “BASIC” GUIDELINES FOR MODEL 9200 - DIP-SWITCH AND WIRING REFERENCE UL 325 August 2018 Standard This vehicular gate operator is designed for Class III and Class IV applications only and Important: Controls intended for user activation must be located at least six (6) feet away from any moving part of the gate and where the user is prevented from reaching over, under, around or through the gate to operate the must never be used in applications serving the general public.

This manual is also suitable for:

9230923592409245