50
INSPECTION AND MAINTENANCE
4. Connect a water hose to the flushing
devise and turn on the water and
adjust the flow so that excess water
continues leaking out from around
the rubber cups to ensure the engine
is receiving an adequate supply of
cooling water.
1
1. Gear case flushing device
5. Place the shift lever in the neutral
position and start the engine and run
at idle speed for 3-5 minutes.
6. Check if a steady stream of water
flows from the cooling water check
port.
7. Stop the engine and turn off the
10
water. Remove the flushing devise and
tape. Install the propeller.
8. Leave the outboard motor in vertical
position to completely drain the cool-
ing water from the outboard motor.
ENOF01420-C