Baxi Solo 2 PF Installation And Servicing Instruction page 40

Wall mounted powered flue gas fired central heating unit
Table of Contents

Advertisement

10.0 Changing Components – Page 40
10.10 Burner (Fig. 113)
1. Remove the burner assembly, by pulling it forward.
2. Fit new burner and re-assemble all components in
reverse order of dismantling.
10.11 Burner Injector (Fig. 114)
1. Release and remove the burner injector which is
screwed into the burner feed manifold.
2. Fit the new burner injector ensuring that the copper
washer is in position. Tighten the injector fully.
3. Re-assemble all components in reverse order.
10.12 Pilot Burner Injector (Fig. 115)
1. Remove the right hand side insulation carrier bracket by
releasing the screw. Remove the side insulation panel.
2. Release the screw securing the pilot hood and remove.
Carefully remove the pilot injector. Fit the new pilot injector
ensuring the new sealing washer is in position. Tighten the
injector fully.
3. Re-assemble all components in reverse order.
10.13 Gas Manifold (Fig. 116)
1. Remove the right hand side insulation carrier bracket by
releasing the screw. Remove the side insulation panel
(Fig. 113).
2. Remove the two screws securing the manifold from the
inside of the combustion box and slide the manifold
forward from under the two rear locating studs.
3. Remove valve and ancillary components from
manifolds as necessary.
4. Replace all ancillary components onto manifold and
replace manifold by sliding rear edge backwards under the
two rear locating studs and securing from inside the
combustion box using the two screws previously removed.
Ensure that the sealing gasket is properly positioned and
undamaged.
40

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents