Baxi Solo 2 PF Installation And Servicing Instruction page 26

Wall mounted powered flue gas fired central heating unit
Table of Contents

Advertisement

5.0
Installation – Page 26
5.15 Internal Fitting Kit (Cont)
6. Refit the end piece to the liner and open out to the
thickness of the wall. Seal the two pieces together using
the tape provided with the kit (Fig 64).
7. Slide the assembled wall liner into the hole in the wall
until the tags stop against the inner wall with the seam of
the liner uppermost. Mark the positions of the holes in the
tags on the wall and then rotate liner so that tags reveal
marks (Fig. 65).
8. Drill and plug the wall in these positions (Fig. 66).
9. Rotate liner back until the tags align with the holes
drilled and secure it to the wall using suitable screws (Fig.
67).
10. Make good between the edge of the liner and the
outside wall with cement mortar or a similar substance, by
reaching through the liner and pressing the mortar
between liner and the outside brick work (Fig. 68). Make
good between the liner and the inside wall. Apply soap
solution to the '0' ring inside the liner.
11. The rest of the installation may now proceed as
described.
26

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents