Baxi Solo 2 PF Installation And Servicing Instruction page 15

Wall mounted powered flue gas fired central heating unit
Table of Contents

Advertisement

5.0
Installation – Page 15
5.3 Position the Boiler (Fig. 19)
1. Choose a suitable position for. the boiler making
necessary allowances for the minimum clearances
required as shown in the table below.
ModeI
A
30
360
40
360
50
360
60
472
70
472
80
472
2. Hold the wall template against the wall at the required
boiler location. Ensure that the top of the template is level
(Fig. 20).
3. The template represents the outer limits of the appliance
plus the required minimum side clearance.
4. Mark the position of the flue hole centre and the inward
pointing corners of the two triangular cut-outs in the
template. Mark the position of the four fixing holes. Where
possible use the uppermost and lowest fixing hole
positions, otherwise space the fixing holes as far apart as
possible (Fig. 20).
5.4 Rear Flue
1. For installations where the flue terminal is inaccessible
from the outside, an internal fitting kit is available. This can
be obtained free of charge from your local merchant
quoting Baxi Part Nº 226441.
2. If using the internal fitting kit a 117mm (4
diameter hole is required.
3. Drill the anchorage holes 63mm (2 ½ in) deep to accept
suitable wall plugs (Fig. 21).
4. Using the previously marked flue hole centre, cut a hole
approximately 107mm (4 ¼ in) diameter in the masonry for
the 100mm (4 in) diameter flue duct. (When using a core
drill, it is important to keep the drill level and square).
15
5
/
in)
8

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents