This chapter covers the steps required to install components and perform simple
maintenance on the SC942i-R760 chassis. Following the component installation
steps in the order given will eliminate most common problems. If some steps are
unnecessary, skip ahead to the step that follows. Refer to Chapter 2 for instruc-
tions on installing the system as a 4U rackmount.
Tools Required
The only tool you will need is a Philips screwdriver.
6-1
Static-Sensitive Devices
Static electrical discharge can damage electronic components. To prevent
damage to any printed circuit boards (PCBs), it is important to handle them
very carefully. The following measures are generally sufficient to protect your
equipment from static discharge.
Precautions
• Use a grounded wrist strap designed to prevent static discharge.
• Touch a grounded metal object before removing any board from its anti-
static bag.
• Handle a board by its edges only; do not touch its components, peripheral
chips, memory modules or gold contacts.
• When handling chips or modules, avoid touching their pins.
• Put the serverboard, add-on cards and peripherals back into their anti-
static bags when not in use.
• For grounding purposes, make sure your computer chassis provides ex-
cellent conductivity between the power supply, the case, the mounting
fasteners and the serverboard.
Unpacking
The serverboard is shipped in antistatic packaging.
board, make sure the person handling it is static protected.
Chapter 6
Advanced Chassis Setup
Chapter 6: Advanced Chassis Setup
6-1
When unpacking the