Mounting The Appliance - Baxi LUNA SAT RCZ G1-MB Installation And Operating Manual

Built-in user modules, m-bus models transmission of consumption via cable
Table of Contents

Advertisement

Available languages

Available languages

After completing the masonry work, insert the LUNA SAT module into the casing/template and fix it to the connectors of
the four taps inside the casing/template.
Secure the electrical box to the bracket on the casing with the supplied nut.
MODEL WITH LITER COUNTER L = 80mm G 3/4"
80
40
86
IP
MR
UP
RR
UC
1
UC
2
UC
3
86,5
33,5
Figure 4: Connectors and sizes
Key
CONNECTIONS TO CENTRALISED PLANT
IP: primary inlet from centralised plant G 1" M
UP: primary outlet from centralised plant G 1" M
HEATING PLANT CONNECTIONS
MR: heating plant delivery G 1" M
RR: heating plant return G 1" M
DOMESTIC WATER METER CONNECTIONS
(domestic water taps supplied as an accessory)
EC1: Domestic water inlet to meter G 3/4" M or G 1" M
EC2: Domestic water inlet to second meter G 3/4'' M or G 1" M
EC3: Domestic water inlet to third meter G 3/4'' M or G 1" M
UC1: Domestic water outlet from meter G 3/4" M or G 1" M
UC2: Domestic water outlet from second meter G 3/4'' M or G 1" M
UC3: Domestic water outlet from third meter G 3/4'' M or G 1" M
AE: Hole for cables
INSTALLATION AND OPERATING MANUAL

5. MOUNTING THE APPLIANCE

550
376
EC1
EC2
EC3
254
204
AE
86
40
80
MR
IP
RR
UP
UC1
EC
1
UC2
EC
2
UC3
EC
3
33,5
86,5
90
86
IP
UP
EC1
EC2
EC3
188,7
37
MODEL WITH LITER COUNTER
L=130mm G 1"
376
86
MR
RR
UC1
UC2
UC3
273,3
86
7215037.01 - en

Advertisement

Chapters

Table of Contents
loading

Table of Contents